Up to 80% of a product's final cost is locked in during the design phase \u2014 before a single tool is cut. The founders who hit target cost are the ones who interrogated the design before asking suppliers to price it. This is the exact 12-point pre-tooling review SciPure runs on every program.
What you get
- The 12-point DFM checklist (printable PDF)
- A scoring sheet to rate your own design
- A one-page cost-risk cheat-sheet for mold quotes
The 12 points
- Tolerance audit \u2014 flag every tolerance tighter than the function it serves.
- Wall thickness uniformity \u2014 unify nominal wall; proper transitions only.
- Draft angles \u2014 every molded face needs release angle.
- Undercuts / side-actions \u2014 count them; each is a separate mold mechanism.
- Parting line placement \u2014 minimize cosmetic splits and flash risk.
- Material vs load case \u2014 qualify one grade where possible.
- Fastener minimization \u2014 screws to snap-fits where it saves assembly.
- Assembly step count \u2014 add poka-yoke, cut stations.
- Cavitation & steel size \u2014 right-size the mold to volume.
- Surface finish vs cost \u2014 spec only what the user sees.
- Tolerance stack-up \u2014 analyze the chain, not single dimensions.
- Landed-cost review \u2014 BOM, tariff, freight before tooling.
Get the printable checklist + scoring sheet
Free. No strings. We'll send the PDF to your inbox.
Get the free DFM checklistFrequently asked
Is this really free?
Yes. It's the same review framework we use on paid engagements \u2014 the checklist itself is ours to share.
What if I want you to run it on my design?
That's the paid DFM review. Book a free 30-minute call and we'll walk your CAD line by line.
Related: Your Unit Cost Was Decided in CAD (The 80% Rule) · Understanding DFM · From Concept to Mass Production (hub)